National Commercial EV Statutory & Utility Directory
The definitive statutory compliance and utility make-ready repository for county officials, school superintendents, commercial REITs, and HOA boards seeking $0 net capital EV deployment.
Request Free Infrastructure & Grant AuditTarget Mandate States & High-Density Jurisdictions
Select your state to explore localized county building codes, utility tariffs, and turnkey funding models:
California
California enforces the strictest building decarbonization mandates and most aggressive utility make-ready funding regimes in the nation under CALGreen Title 24, CPUC Rule 29, and regional air quality rules.
• Los Angeles County
• Orange County
• Santa Clara County
• San Diego County
• Alameda County
Texas
Texas is experiencing unprecedented commercial expansion and fleet electrification, driven by TCEQ clean fleet grants, utility make-ready programs, and massive corporate headquarters relocations across the Texas Triangle.
• Travis County
• Harris County
• Dallas County
• Collin County
• Bexar County
Florida
Florida is undergoing a historic surge in commercial and multifamily electrical retrofits. Post-Surfside SB 4-D and SB 154 mandatory structural and electrical milestone inspections have compelled condo boards and commercial owners to modernize electrical switchgear—creating a once-in-a-generation window to deploy 100% utility-funded EV charging with FPL and Duke Energy.
• Miami-Dade County
• Broward County
• Palm Beach County
• Hillsborough County
• Orange County (FL)
New York
New York operates the nation's most aggressive building decarbonization penalty framework under NYC Local Law 97, backed by over $700 million in utility make-ready funding under NYS PSC Case 18-E-0138 (ConEd PowerReady covering up to 100% of infrastructure costs).
• New York County (NYC Metro)
• Westchester County
• Nassau County
• Suffolk County
• Erie County
Washington
Washington State enforces mandatory EV charging building codes (RCW 19.27.540 & WAC 51-50-0429 requiring at least 10% installed Level 2 EVSE and 25% EV-ready spaces) alongside generous commercial make-ready grants from Puget Sound Energy and Seattle City Light.
Colorado
Colorado enforces the Model EV Ready Building Code (HB 23-1233) while Xcel Energy Colorado provides up to 100% utility make-ready coverage for commercial, multifamily, and income-qualified properties, stacked with Charge Ahead Colorado grants up to $9,000 per dual-port charger.
• Denver County (City & County of Denver)
• Boulder County
• Arapahoe County
Maryland
Maryland is the foundational operating base of Smart Property Innovation. Under the Climate Solutions Now Act of 2022 and the Public Service Commission's EVsmart program, utilities (BGE, Pepco, Delmarva) cover up to 100% of customer make-ready utility costs, stacked with MEA state grants of $5,000/port.
• Montgomery County
• Prince George's County
• Baltimore County
• Fairfax County (VA)